Polavaram dam gets diaphragm wall

Work on Polavaram project under way in West Godavari district .A.V.G. Prasad

Work on Polavaram project under way in West Godavari district .A.V.G. Prasad  

The first of its kind built to minimise seepage of water and increase stability

The diaphragm wall built to eliminate seepage below the dam in order to minimise water loss and increase stability will make the Polavaram Irrigation Project (PIP) unique.

The 1,397-metre long wall constructed underground — going to the depth of up to 95 metres at some points — will be completed on Saturday, a couple of days ahead of time. The contractors, L&T, and German engineering company Bauer had agreed to finish it on Monday — in time for Andhra Pradesh Chief Minister N. Chandrababu Naidu’s visit. Polavaram will be the first major irrigation project in the country to have a diaphragm wall. Principal Secretary Shashi Bhushan Kumar said the challenge was to complete the wall before monsoon. The contractors finished the work a couple of days in advance, he said.

‘Formidable task’

Polavaram Chief Engineer Veeramachineni Sridhar explained that the diaphragm wall was an underground sealing (cut-off wall) for water retaining structures. Water tightness, plasticity and erosion resistance were the most important criteria. Ideally, the base of a cut-off wall should be keyed into an underlying impermeable soil or rock formation (clay layer, bedrock) which, in the case of Polavaram dam, was about 300 feet (about 100 metres).

Completing the diaphragm wall in two seasons (summers) was a formidable task, he said. Dry conditions were needed because even the slightest drizzle filled up the trench and work had to be stopped.

Three heavy duty trench cutters and two grabbers were pressed into service for building the underground wall which is 1.5 metres thick having a total area of 66,000 square metres.

The total cost of building the wall was put at Rs. 467.72 crore.

saichinu

Avatar / Picture

Once & Always Tarak
Registered:
Posts: 29,022
Reply with quote  #2 
 
polavaram-10062018-1.jpg
share.png
ఏడున్నర దశాబ్ధాల విఘ్నాలను పోలవరం ఎట్టకేలకు అధిగమించింది. అమలుకు నోచని విభజన హామీలతో అభద్రతాభావంలో కూరుకుపోయిన ఆంధ్ర జాతికి ఇప్పుడు పోలవరం ప్రాణనాడి కాబోతోంది. ఆల్మట్టి నిర్మాణంతో ఆకా రం కోల్పోయిన కృష్ణా బేసిన్‌కు జీవనాడై ఊపిరులు ఊదబోతోంది. అడుగడుగు విఘ్నాలతో ప్రాజెక్టుపై ప్రజలు ఆశలు కోల్పోతున్న దశ లో ఈ విళంబి నామ సంవత్సరంలో పోలవరం ఊహలకు అందని ప్రొగ్రెస్‌ను సొంతం చేసుకున్నది. ఇప్పటివరకు పూర్తయిన 55 శాతం పనుల్లో గడిచిన అయిదు నెలల కాలంలోనే 25 శాతం పనులు జర గడం ఈ ఏడాది పోలవరం పురోగతికి అద్దం పడుతోంది. సాంకేతిక సమస్యల సమాహారంగా మారిన ఈ ప్రాజెక్టు బలారిష్టాలను దాటు తుండడం ఉత్తరాంధ్ర నుంచి రాయలసీమ వరకు ప్రజల్లో కొత్త ఆశలు చిగురింపజేస్తోంది.
 

polavaram 10062018 2

saichinu

Avatar / Picture

Once & Always Tarak
Registered:
Posts: 29,022
Reply with quote  #3 
http://d2na0fb6srbte6.cloudfront.net/read/imageapi/clipimage/1692933/1c6989c7-3ef1-49e8-8ad2-d4284520e642
saichinu

Avatar / Picture

Once & Always Tarak
Registered:
Posts: 29,022
Reply with quote  #4 
NSnqssQ.jpg
saichinu

Avatar / Picture

Once & Always Tarak
Registered:
Posts: 29,022
Reply with quote  #5 

Congratulations #team #Polavaram and @ncbn on completing the construction of 1400 mts of Diaphragm Wall of Polavaram Project. 
This can be a reality only under the able leadership of @ncbn, soon he will dedicate this to people & Famers of AP and to the Nation. #AndhraPradeshpic.twitter.com/KmFPhEVnDv

— Ram Mohan Naidu K (@RamMNK) June 11, 2018
saichinu

Avatar / Picture

Once & Always Tarak
Registered:
Posts: 29,022
Reply with quote  #6 
పోలవరం రికార్డు బద్దలు...
కాంక్రీట్‌ పనుల్లో రికార్డు బద్దలు..
16 గంటల్లో 8 వేల క్యూబిక్‌ మీటర్ల పని..
కాళేశ్వరం రికార్డును అధిగమించిన వైనం..
24 గంటల్లో పదివేల క్యూబిక్‌ మీటర్లకు పైనే...

పని చేసిన అందరికీ, ముఖ్యమంత్రి చంద్రబాబుకి, ఇరిగేషన్ మంత్రి దేవినేని ఉమాకి అభినందనలు... pic.twitter.com/n2XO0IVMfZ
saichinu

Avatar / Picture

Once & Always Tarak
Registered:
Posts: 29,022
Reply with quote  #7 
saichinu

Avatar / Picture

Once & Always Tarak
Registered:
Posts: 29,022
Reply with quote  #8 
saichinu

Avatar / Picture

Once & Always Tarak
Registered:
Posts: 29,022
Reply with quote  #9 
636643037332390620.jpg
అమరావతి: నిర్మాణపరంగా పోలవరం ప్రాజెక్టు మరో రికార్డు సాధించిందని మంత్రి దేవినేని ఉమామహేశ్వర్‌రావు అన్నారు. సోమవారం మీడియాతో మాట్లాడుతూ స్పిల్‌ ఛానల్‌, స్పిల్‌ వే పనుల్లో ఒక్కరోజులో 11,158 క్యూబిక్‌ మీటర్ల కాంక్రీట్‌ పనులతో రికార్డు సాధించామన్నారు. దేశంలో ఏ సాగునీటి ప్రాజెక్టులో ఈస్థాయి కాంక్రీట్‌ పనులు చేయలేదని చెప్పారు. చైనా త్రీగోర్జెస్‌ డ్యామ్‌లో 24 గంటల్లో 13వేల క్యూబిక్‌ మీటర్ల కాంక్రీట్‌ పనులు జరిగాయని, జులైనాటికి చైనా రికార్డును కూడా అధిగమిస్తామని మంత్రి దేవినేని స్పష్టం చేశారు.
saichinu

Avatar / Picture

Once & Always Tarak
Registered:
Posts: 29,022
Reply with quote  #10 
saichinu

Avatar / Picture

Once & Always Tarak
Registered:
Posts: 29,022
Reply with quote  #11 
The workers, planners and engineers involved in the Polavaram irrigation project have worked hard with incredible dedication. With the completion of the diaphragm wall pylon, the project will soon reach its final stage. https://t.co/mY9nteKUqY
saichinu

Avatar / Picture

Once & Always Tarak
Registered:
Posts: 29,022
Reply with quote  #12 
తిరుమల వెంకటేశ్వర స్వామి ఆలయాన్ని ఎంత భక్తి, శ్రద్ధలతో సందర్శిస్తామో పోలవరంనూ అలానే చూడాలి. అప్పుడే ఇక్కడ జరుగుతున్న పురోగతి ఏమిటన్నది అర్థం చేసుకోగలుగుతారు. ఇప్పటికే ఈ ప్రాజెక్టులో కీలకమైన డయాఫ్రమ్ వాల్‌ పూర్తైంది, అందరి సహకారంతో 2019 డిసెంబర్‌లోపు ప్రాజెక్టునూ పూర్తి చేస్తాము. https://t.co/ktw5ypYd3I
saichinu

Avatar / Picture

Once & Always Tarak
Registered:
Posts: 29,022
Reply with quote  #13 
Compared the progress of 16 natl projects. Shocked to see only 5 have been grounded & Polavaram's the only project on track, thanks to @ncbn. 11 are still under feasibility, appraisal stages. Can't understand why opp parties spread lies to discredit the great work done by @ncbn. https://t.co/Q9EcLEEaHh
saichinu

Avatar / Picture

Once & Always Tarak
Registered:
Posts: 29,022
Reply with quote  #14 
IMG_20180611_205957.jpg  IMG_20180611_205951.jpg  IMG_20180611_205940.jpg 
Movie_Muchatlu

Avatar / Picture

Timepass
Registered:
Posts: 5,477
Reply with quote  #15 
Quote:
Originally Posted by saichinu
తిరుమల వెంకటేశ్వర స్వామి ఆలయాన్ని ఎంత భక్తి, శ్రద్ధలతో సందర్శిస్తామో పోలవరంనూ అలానే చూడాలి. అప్పుడే ఇక్కడ జరుగుతున్న పురోగతి ఏమిటన్నది అర్థం చేసుకోగలుగుతారు. ఇప్పటికే ఈ ప్రాజెక్టులో కీలకమైన డయాఫ్రమ్ వాల్‌ పూర్తైంది, అందరి సహకారంతో 2019 డిసెంబర్‌లోపు ప్రాజెక్టునూ పూర్తి చేస్తాము. https://t.co/ktw5ypYd3I
Better ilantivi chepatam apithe.. 2019 ki eti paristithi lonu purthi avadhu.. anduke each phase ki celebrate chestunaru.. with max publicity.. Instead better make ppl ready that will be completed in second term.. and show this progress. 
saichinu

Avatar / Picture

Once & Always Tarak
Registered:
Posts: 29,022
Reply with quote  #16 
Quote:
Originally Posted by Movie_Muchatlu
Better ilantivi chepatam apithe.. 2019 ki eti paristithi lonu purthi avadhu.. anduke each phase ki celebrate chestunaru.. with max publicity.. Instead better make ppl ready that will be completed in second term.. and show this progress. 
2019 dec ante sec term e mastaru..mellaga move chestunadu date..ssr mvs laga slow ga pushing..
Movie_Muchatlu

Avatar / Picture

Timepass
Registered:
Posts: 5,477
Reply with quote  #17 
Quote:
Originally Posted by saichinu
2019 dec ante sec term e mastaru..mellaga move chestunadu date..ssr mvs laga slow ga pushing..
inko 2-3 yrs minimum pattidhi if orissa dont put any query.. 
Movie_Muchatlu

Avatar / Picture

Timepass
Registered:
Posts: 5,477
Reply with quote  #18 

పోలవరం ప్రాజెక్టు నిర్మాణంలో మరో కీలక ముందడుగు పోలవరం ప్రాజెక్టును త్వరితగతిన పూర్తిచేసేందుకు కేంద్ర ప్రభుత్వం రూ.1,400 కోట్లు విడుదల చేశారు కొత్తగా విడుదల చేసిన ఈ మొత్తంతో ఇప్పటివరకు రూ.6,764 కోట్లు నరేంద్ర మోదీ గారి ప్రభుత్వం విడుదల చేసింది నితిన్ గడ్కరీ గారికి 🙏🙏

saichinu

Avatar / Picture

Once & Always Tarak
Registered:
Posts: 29,022
Reply with quote  #19 
Quote:
Originally Posted by Movie_Muchatlu
inko 2-3 yrs minimum pattidhi if orissa dont put any query.. 
already they are trying max..monnokati esaru..elec ayyedaka ostane untai le..
saichinu

Avatar / Picture

Once & Always Tarak
Registered:
Posts: 29,022
Reply with quote  #20 
ప్రాజెక్టు నిర్మాణానికి ఆంధ్రప్రదేశ్‌ ప్రభుత్వం చేసిన ఖర్చును కేంద్రం తిరిగి చెల్లించడం ఆనవాయితీగా వస్తోంది. ఈక్రమంలో ఈ ఏడాది మార్చి 31లోపే (2017-18 ఆర్థిక సంవత్సరం)రూ.1400 కోట్లు విడుదల కావాల్సి ఉంది. అప్పట్లో కేంద్ర ఆర్థిక శాఖ ఈ నిధుల సమీకరణ కోసం నాబార్డుకు అనుమతినిచ్చినా వివిధ కారణాల వల్ల అది ఆ పని చేయలేకపోయింది. కాలక్రమంలో కొత్త ఆర్థిక సంవత్సరంలోకి అడుగుపెట్టడంతో పాత సంవత్సరంలో ఇచ్చినఅనుమతులకు కాలదోషం పట్టింది. దాంతో కేంద్ర ఆర్థిక శాఖ మరోసారి నిధుల సమీకరణకు నాబార్డుకుఅనుమతిస్తూ మేలో ఉత్తర్వులు ఇచ్చింది. అప్పటినుంచి   నిధుల సమీకరణ కోసం నాబార్డు చేసిన ప్రయత్నాలు ఎట్టకేలకు ఫలించినిధులు ప్రాజెక్టు అథారిటీ ఖాతాకు చేరాయి. రాష్ట్ర ప్రభుత్వంసమర్పించిన మరో రూ.766 కోట్ల బిల్లులు ప్రస్తుతం ప్రాజెక్టు అథారిటీ వద్ద పెండింగ్‌లో ఉన్నాయి. వాటిని పరిశీలించి కేంద్ర జలవనరుల శాఖకు పంపితే ఆ మేరకు రాష్ట్రప్రభుత్వానికి నిధులు రావాల్సి ఉంటుంది. ఈ నిధులన్నీ కేంద్రం పాత డీపీఆర్‌ ప్రకారమే ఇస్తోంది. కొత్త డీపీఆర్‌కు ఆమోదముద్ర వేయలేదు. పాత డీపీఆర్‌ ప్రకారం పోలవరంప్రాజెక్టు సాగునీటి విభాగం అంచనా వ్యయం రూ.12,294 కోట్లు. రాష్ట్ర విభజనకు ముందే దీనిపై రూ.5,136 కోట్లు వెచ్చించారు. ఆ మొత్తాన్ని తిరిగి ఇవ్వబోమని లోగడే కేంద్రం స్పష్టం చేసింది. అదిపోగా మిగిలిన రూ.7,158 కోట్లు చెల్లించాల్సి ఉంది. అందులో ఇప్పటివరకూ ప్రస్తుతరూ.1,400 కోట్లతో కలిపి రూ.6,764 కోట్లు చెల్లించినట్లయింది. ఇకమిగిలింది రూ.395 కోట్లు మాత్రమే. ఒకవేళ పోలవరం ప్రాజెక్టు సవరించిన డీపీఆర్‌కు కేంద్రంఆమోదించకపోతే ఈ ప్రాజెక్టు నిర్మాణానికి కేంద్రం నుంచి కేవలం రూ.395 కోట్లు మాత్రమే వస్తుంది. 2013 భూసేకరణ చట్టం అమల్లోకి వచ్చాక సహాయ, పునరావాస ఖర్చులు పెరిగిపోవడం, 2014 జూన్‌ 2నాటికి ఉన్న ధరల ప్రకారంసాగునీటి విభాగం నిర్మాణ ఖర్చును కేంద్రం భరిస్తుందని హామీనివ్వడంతో రాష్ట్ర ప్రభుత్వం ఇప్పటికే రూ.53వేల కోట్లతో సవరించిన అంచనాలు పంపింది. అందులో సహాయ, పునరావాసానికి రూ.33,225 కోట్లు, సాగునీటి ప్రాజెక్టు నిర్మాణానికి రూ.20,509.46 కోట్లుఖర్చవుతుందని అంచనా. సవరించిన అంచనాలపైసీడబ్ల్యూసీలో ఇప్పటికే పలు దఫాలు చర్చించారు. అది వేసిన కొర్రీలకు రాష్ట్ర ప్రభుత్వం సమాధానం పంపింది. అయినప్పటికీ ఇంతవరకూ దానికి ఆమోదముద్ర వేసే విషయంలో సానుకూలతకనిపించడం లేదు. ఈ విషయంలో కేంద్రం జాప్యం చేస్తే మాత్రంమున్ముందు పోలవరానికి నిధుల కొరత ఎదురయ్యే ప్రమాదం ఉంది. దీన్ని దృష్టిలో ఉంచుకొనే ముఖ్యమంత్రి చంద్రబాబు  ఈ ఏడాదికి తాత్కాలిక ప్రాతిపదికన పోలవరానికి రూ.10వేల కోట్లు విడుదల చేయాలంటూ లేఖ రాయాలని నిర్ణయించినట్లు అధికార వర్గాలు పేర్కొన్నాయి. సవరించిన అంచనాలు  ఆమోదించేంత  వరకూ నిధులు ఇవ్వకపోతే ప్రాజెక్టు నిర్మాణంలో జాప్యమయ్యే ప్రమాదం ఉన్నందున తాత్కాలికంగా రూ.10వేల కోట్లకు అనుమతినిచ్చి డీపీఆర్‌కు అంతిమ ఆమోదం పొందాక ఈ మొత్తాన్ని అందులో సర్దుబాటు చేసుకోవాలని ముఖ్యమంత్రి కేంద్రాన్ని కోరనున్నట్లు సమాచారం.
saichinu

Avatar / Picture

Once & Always Tarak
Registered:
Posts: 29,022
Reply with quote  #21 
రూ.10 వేల కోట్లు ఇవ్వండి
నితిన్‌గడ్కరీకి దేవినేని లేఖ
ఈనాడు, అమరావతి: పోలవరం ప్రాజెక్టుకు 2013-14 ధరల ప్రకారం సవరించిన అంచనాలుఆమోదించే లోపు రూ.10 వేల కోట్లు ఇవ్వాలని కేంద్ర జలవనరులశాఖ మంత్రి నితిన్‌ గడ్కరీకి రాష్ట్రం విజ్ఞప్తి చేసింది. ఈ మేరకు ఏపీ జలవనరులశాఖ మంత్రి దేవినేని ఉమామహేశ్వరరావు ఒక లేఖరాశారు. పోలవరం ప్రాజెక్టు పనులు వేగవంతం చేసేందుకు కేంద్ర ప్రభుత్వ పరంగా పరిష్కరించాల్సిన సమస్యలకు సంబంధించి సంబంధితఅధికారులతో ఒక సమావేశం ఏర్పాటు చేయాలని ఆ లేఖలో విన్నవించారు. పోలవరంప్రాజెక్టుకు రూ.1400 కోట్లువిడుదల చేసినందుకు కృతజ్ఞతలు చెప్పారు.
 
saichinu

Avatar / Picture

Once & Always Tarak
Registered:
Posts: 29,022
Reply with quote  #22 
last year dpr ippudu icharu 1400c..new dpr approve cheyyali..inka state pettina 700c ivvali ...tondarga chesi pedite oka shape ki ostadi..
saichinu

Avatar / Picture

Once & Always Tarak
Registered:
Posts: 29,022
Reply with quote  #23 
2013 భూసేకరణ చట్టం అమల్లోకి వచ్చాక సహాయ, పునరావాస ఖర్చులు పెరిగిపోవడం, 2014 జూన్‌ 2నాటికి ఉన్న ధరల ప్రకారం సాగునీటి విభాగం నిర్మాణ ఖర్చును కేంద్రం భరిస్తుందని హామీనివ్వడంతో రాష్ట్ర ప్రభుత్వం ఇప్పటికే రూ.53వేల కోట్లతో సవరించిన అంచనాలు పంపింది. అందులో సహాయ, పునరావాసానికి రూ.33,225 కోట్లు, సాగునీటి ప్రాజెక్టు నిర్మాణానికి రూ.20,509.46 కోట్లు ఖర్చవుతుందని అంచనా. సవరించిన అంచనాలపై సీడబ్ల్యూసీలో ఇప్పటికే పలు దఫాలు చర్చించారు. అది వేసిన కొర్రీలకు రాష్ట్ర ప్రభుత్వం సమాధానం పంపింది. అయినప్పటికీ ఇంతవరకూ దానికి ఆమోదముద్ర వేసే విషయంలో సానుకూలత కనిపించడం లేదు. ఈ విషయంలో కేంద్రం జాప్యం చేస్తే మాత్రం మున్ముందు పోలవరానికి నిధుల కొరత ఎదురయ్యే ప్రమాదం ఉంది. దీన్ని దృష్టిలో ఉంచుకొనే ముఖ్యమంత్రి చంద్రబాబు  ఈ ఏడాదికి తాత్కాలిక ప్రాతిపదికన పోలవరానికి రూ.10వేల కోట్లు విడుదల చేయాలంటూ లేఖ రాయాలని నిర్ణయించినట్లు అధికార వర్గాలు పేర్కొన్నాయి. సవరించిన అంచనాలు  ఆమోదించేంత  వరకూ నిధులు ఇవ్వకపోతే ప్రాజెక్టు నిర్మాణంలో జాప్యమయ్యే ప్రమాదం ఉన్నందున తాత్కాలికంగా రూ.10వేల కోట్లకు అనుమతినిచ్చి డీపీఆర్‌కు అంతిమ ఆమోదం పొందాక ఈ మొత్తాన్ని అందులో సర్దుబాటు చేసుకోవాలని ముఖ్యమంత్రి కేంద్రాన్ని కోరనున్నట్లు సమాచారం.
Movie_Muchatlu

Avatar / Picture

Timepass
Registered:
Posts: 5,477
Reply with quote  #24 
Lucky Rayapati.. 25k nunchi 52k ki vellindi project.. 


saichinu

Avatar / Picture

Once & Always Tarak
Registered:
Posts: 29,022
Reply with quote  #25 
Eppudo jamana lekkalu 10 k icharu estimation central ki DPR.5k state divide avvaka munde icharu..

14 lo new cost batti adi 50k adigaru central ni as centre promised to bear..30k people shifting helping compensate edo..20k for proj ee DPR approve avvale inka..

Old batti inka 350c edo balance anthe...new di ivvakapote chippe inka polavaram..so cbn atleast asking 10k c for now..

A dholera ki oka laksha cr avuddi emo.. monna a highway ki 80k cr edo ayyindi anni north ke..deniki just 10k cr ivandi modi sor..
Movie_Muchatlu

Avatar / Picture

Timepass
Registered:
Posts: 5,477
Reply with quote  #26 
Quote:
Originally Posted by saichinu
Eppudo jamana lekkalu 10 k icharu estimation central ki DPR.5k state divide avvaka munde icharu..

14 lo new cost batti adi 50k adigaru central ni..30k people shifting helping compensate edo..20k for proj ee DPR approve avvale inka..

Old batti inka 350c edo balance anthe...new di ivvakapote chippe inka polavaram..so cbn atleast asking 10k c for now..

A dholera ki oka laksha cr avuddi emo.. monna a highway ki 80k cr edo ayyindi anni north ke..deniki just 10k cr ivandi modi sor..
National Highways andariki istunaru.. inka DOlera dhi anta ledu ani videos kuda vachyai ga,,, 

Undavalli ee shifting lo jarigina corruption gurinchi videos pettadu kada.. anduke agaremo... 
saichinu

Avatar / Picture

Once & Always Tarak
Registered:
Posts: 29,022
Reply with quote  #27 
Quote:
Originally Posted by Movie_Muchatlu
National Highways andariki istunaru.. inka DOlera dhi anta ledu ani videos kuda vachyai ga,,, 

Undavalli ee shifting lo jarigina corruption gurinchi videos pettadu kada.. anduke agaremo... 
bills submit chesinave dikku ledu kani ap ki...last year ivvalsinavi ippudu ichi dappu kottadam..state amt pettinde inka rale enakki .. centre e approve cheyyali amt spend chesina OCs..avi chesina maku submit e cheyyale ani sollu shaw kaburlu chala vinnam..

Dholera 2l acres pai mata..capital 33k acres..ocs ivvani state lo gujju last untadi aina kumbhalu istaru le..

State e spending mundu delay avvakudadu centre eppudo istaru ani..a spend chesinavi cliam kuda    bills ocs pettinavi approve chesinavi tondarga release cheste goppa..
saichinu

Avatar / Picture

Once & Always Tarak
Registered:
Posts: 29,022
Reply with quote  #28 
Ika undavalli emundi le monna modi shaw seva rajakiyala meda..their history in godra murders..shaw remand meda vid relesase chesadu ga..

Ayana vids ki anta imp unte modi shaw ni lopala eseduru e patiki..
JordanBelfort

Avatar / Picture

Jackie
Registered:
Posts: 1,355
Reply with quote  #29 
Quote:
Originally Posted by Movie_Muchatlu
Lucky Rayapati.. 25k nunchi 52k ki vellindi project.. 




Adi R&R ki baabu konchem research chesi veyyandi postlu
Movie_Muchatlu

Avatar / Picture

Timepass
Registered:
Posts: 5,477
Reply with quote  #30 
Quote:
Originally Posted by saichinu
bills submit chesinave dikku ledu kani ap ki...last year ivvalsinavi ippudu ichi dappu kottadam..state amt pettinde inka rale enakki .. centre e approve cheyyali amt spend chesina OCs..avi chesina maku submit e cheyyale ani sollu shaw kaburlu chala vinnam..

Dholera 2l acres pai mata..capital 33k acres..ocs ivvani state lo gujju last untadi aina kumbhalu istaru le..

State e spending mundu delay avvakudadu centre eppudo istaru ani..a spend chesinavi cliam kuda    bills ocs pettinavi approve chesinavi tondarga release cheste goppa..

96-04 lo asalu deeni gurinchi pattinchukune ledu.. YSR brought it back to lime light with all the approvals. (may be his intention is also elections & corruption)

State spending is more to ensure its under their control and get their contractors to get work.. dani kosam malli edo thyagam chesina matalu enduku lendi.. inallu natha nadaka nadichi inka election last 2 years lo pargeduthundi... 

inka next post lo Dholera 3l crores post vastundemo..

antha fraud chese guju tho tie up ayyina CBN ni ela nammali inka.. ? ipudu malli congress antunaru oka 4 yrs ayyaka malli.. gandhi family dochukovtleda antaru...  its a cycle of events.. 

But Polvaram complete cheste benifit ayedhi AP.. so if he can complete.. not harm in bringing him back. kaani prathi phase ki publicity chestunapudu konchem ekuva highlight avuthundi both sides.. 

Movie_Muchatlu

Avatar / Picture

Timepass
Registered:
Posts: 5,477
Reply with quote  #31 
Quote:
Originally Posted by JordanBelfort


Adi R&R ki baabu konchem research chesi veyyandi postlu

Tapu ledu.. if its wrong I accept it and change.. nenu chadivinavi during 2013/14 gurthunadi vesanu.. u can correct with u r number.. 

I mentioned abt astronomical rise in numbers.. even the minister mentioned the same where in Congress govt increased the budget for one other project similar way which became hub for corruption..

No harm in asking questions and getting clarifications. 

http://www.thehindu.com/todays-paper/tp-national/tp-andhrapradesh/rr-component-has-pushed-up-polavaram-cost-devineni/article19886304.ece 
Movie_Muchatlu

Avatar / Picture

Timepass
Registered:
Posts: 5,477
Reply with quote  #32 
Quote:
Originally Posted by saichinu
Ika undavalli emundi le monna modi shaw seva rajakiyala meda..their history in godra murders..shaw remand meda vid relesase chesadu ga..

Ayana vids ki anta imp unte modi shaw ni lopala eseduru e patiki..
Yes his words if carried any importance at national level would be taken seriously by now.. But same undavalli has got some reputation in providing the data. so if we have any counter arguments mentioning its wrong. we can discuss or can be dismissed as allegations. 
saichinu

Avatar / Picture

Once & Always Tarak
Registered:
Posts: 29,022
Reply with quote  #33 
Quote:
Originally Posted by Movie_Muchatlu

96-04 lo asalu deeni gurinchi pattinchukune ledu.. YSR brought it back to lime light with all the approvals. (may be his intention is also elections & corruption)

State spending is more to ensure its under their control and get their contractors to get work.. dani kosam malli edo thyagam chesina matalu enduku lendi.. inallu natha nadaka nadichi inka election last 2 years lo pargeduthundi... 

inka next post lo Dholera 3l crores post vastundemo..

antha fraud chese guju tho tie up ayyina CBN ni ela nammali inka.. ? ipudu malli congress antunaru oka 4 yrs ayyaka malli.. gandhi family dochukovtleda antaru...  its a cycle of events.. 

But Polvaram complete cheste benifit ayedhi AP.. so if he can complete.. not harm in bringing him back. kaani prathi phase ki publicity chestunapudu konchem ekuva highlight avuthundi both sides.. 

kangaru lo posts chudaru emo..indaka 19 dec ante fst term anukunaru..2l acres land annaru crs analedu..

Ikkada evvadu tyagalu chesesi goppa personality leru le modi tho saha..naku aditho pani avuddi mutual benifit anukunte kalustaru...pani aipoyaka edu lekapoina manaki odedi ledu ane pos lo modi ochadu kabattu cbn aaku mukka..repu cong a next malli bjp tho kalisina eppudu mutual benifits ke anthe kani pakkanodni udaridam ani kadu..pani cheyistunar avutundi kabatti publicity chestar em road esaka road show ki ellada enti modi open top lo idi anthe..
Movie_Muchatlu

Avatar / Picture

Timepass
Registered:
Posts: 5,477
Reply with quote  #34 
Quote:
Originally Posted by saichinu
kangaru lo posts chudaru emo..indaka 19 dec ante fst term anukunaru..2l acres land annaru crs analedu..

Ikkada evvadu tyagalu chesesi goppa personality leru le modi tho saha..naku aditho pani avuddi mutual benifit anukunte kalustaru...pani aipoyaka edu lekapoina manaki odedi ledu ane pos lo modi ochadu kabattu cbn aaku mukka..repu cong a next malli bjp tho kalisina eppudu mutual benifits ke anthe kani pakkanodni udaridam ani kadu..pani cheyistunar avutundi kabatti publicity chestar em road esaka road show ki ellada enti modi open top lo idi anthe..


meeru Dec 19 anapudu.. nenu even if doesnt complete parledu.. if ppl can see that porgress is going brisk it will be an advantage CBN ananu.. 

Modi ni vimarsincharu.. ipudu CBN ni antaru.. daaniki defend cheyakarledu... 

saichinu

Avatar / Picture

Once & Always Tarak
Registered:
Posts: 29,022
Reply with quote  #35 
RR ki chesina pp ki inc chesina approve cheste kada asala  ..a jamana lo ayyina 350c e inka rale..state pettina 700c rale..ee 1000c repu elec mundu ichi dulipestsru..

avi ochaka e kotha dpr sangati chudochu..
saichinu

Avatar / Picture

Once & Always Tarak
Registered:
Posts: 29,022
Reply with quote  #36 
Quote:
Originally Posted by Movie_Muchatlu

Tapu ledu.. if its wrong I accept it and change.. nenu chadivinavi during 2013/14 gurthunadi vesanu.. u can correct with u r number.. 

I mentioned abt astronomical rise in numbers.. even the minister mentioned the same where in Congress govt increased the budget for one other project similar way which became hub for corruption..

No harm in asking questions and getting clarifications. 

http://www.thehindu.com/todays-paper/tp-national/tp-andhrapradesh/rr-component-has-pushed-up-polavaram-cost-devineni/article19886304.ece 
haha..lucky rayapati ani question adigara a post lo..
Movie_Muchatlu

Avatar / Picture

Timepass
Registered:
Posts: 5,477
Reply with quote  #37 
Quote:
Originally Posted by saichinu
haha..lucky rayapati ani question adigara a post lo..
adagaledu... chepanu.. He is quite lucky congress lo thinadu.. ipudu TDP time lonu tintunadu.. very few ppl are there like him. MP seat techukunapude wow anam memu GUntur DIst lo.. as CBN doesnt give seat that easily that too in Guntur the strongest dist of TDP 😉
saichinu

Avatar / Picture

Once & Always Tarak
Registered:
Posts: 29,022
Reply with quote  #38 
Quote:
Originally Posted by Movie_Muchatlu


meeru Dec 19 anapudu.. nenu even if doesnt complete parledu.. if ppl can see that porgress is going brisk it will be an advantage CBN ananu.. 

Modi ni vimarsincharu.. ipudu CBN ni antaru.. daaniki defend cheyakarledu... 

complete avvadu ani cheppite janalu tupuk antaru....mundu elec mundu anevadu ippudu dec antunadu....they are tracking by weekly basis janalu kuda chustunaru..so major event appudu clear ga cheptunadu inta percent ayyindi ani..so ala oka 70 ki teskelli progress chupinchi 14 to 19..unko year or 2 lo chesta ani cheptadu...anthe gani avvadu ani cheppeste ika assam..
saichinu

Avatar / Picture

Once & Always Tarak
Registered:
Posts: 29,022
Reply with quote  #39 
http://d2na0fb6srbte6.cloudfront.net/read/imageapi/clipimage/1694051/ed6d5f02-6ce5-4dc7-88b3-282d661b1dd2
saichinu

Avatar / Picture

Once & Always Tarak
Registered:
Posts: 29,022
Reply with quote  #40 

This Navayuga is appreciated by CBN and should be by all,last year polavarm 3 months work apesaru due to funds issue centre

cbn went many times to  gadkari,last ki mh ki kuda velladu gadkari intiki deeni gurinchi,uma also went.

finally  cbn requested navayuga old rates ki accept cheyyamani, appudu gadkari ki chepte icharu, old rates ke chestam anadam tho gadkari  accepted, the extra state has to bear..last year gadkari accept chesinave now last week release chesaru 1400cr..

this team took it as challenge and completed, else this would have been done 2 months before.


saichinu

Avatar / Picture

Once & Always Tarak
Registered:
Posts: 29,022
Reply with quote  #41 
http://d2na0fb6srbte6.cloudfront.net/read/imageapi/clipimage/1693803/2f406c16-3b56-4c81-ae8f-5b6b1a5e62de
saichinu

Avatar / Picture

Once & Always Tarak
Registered:
Posts: 29,022
Reply with quote  #42 
http://d2na0fb6srbte6.cloudfront.net/read/imageapi/clipimage/1694201/db1d5f28-cb29-4d24-b6ca-50d0282f48a2
saichinu

Avatar / Picture

Once & Always Tarak
Registered:
Posts: 29,022
Reply with quote  #43 
డయాఫ్రమ్‌వాల్‌ అంటే భూగర్భంలో నిర్మించేది. 95మీటర్ల లోతులో నిర్మించారు. దీని వెడల్పు 1.5మీటర్లు. నదిలో 1396.60మీటర్ల పొడవున కట్టారు. రెండే సీజన్లలో 414 పనిదినాల్లోనే పూర్తిచేశారు. 

ప్రాజెక్టును జాతికి అంకితం చేస్తున్నాం. దీన్ని చేపట్టడం నా అదృష్టం. ప్రాజెక్టును పూర్తిచేసుకుని కరవు రహిత రాష్ట్రంగా తయారుచేసుకుంటాం. 
2019 జూన్‌ నాటికి గ్రావిటీ ద్వారా నీళ్లు ఇస్తాం. 

ఇంత కష్టపడి ప్రాజెక్టు నిర్మిస్తోంటే.. వైకాపా నాయకులు విషం చిమ్మారు. ప్రాజెక్టు పూర్తయితే ప్రజల జీవితాల్లో వెలుగు వస్తుంది. అది వారికిష్టం లేదు.ఏదేమైనా పోలవరం ప్రాజెక్టును
పూర్తి చేసి తీరతా. 

ఈనాడు డిజిటల్‌ - ఏలూరు, పోలవరం - న్యూస్‌టుడే

జాతికి జీవనాడైన పోలవరం ప్రాజెక్టుకు డయాఫ్రమ్‌వాల్‌ నిర్మాణాన్ని విజయవంతంగా పూర్తిచేసి, కీలక మైలురాయిని అధిగమించామని ముఖ్యమంత్రి చంద్రబాబు నాయుడు ఘనంగా ప్రకటించారు.ఈ సందర్భంగా సోమవారం ఆయన ప్రాజెక్టు వద్ద పైలాన్‌ ఆవిష్కరించారు. అంతకుముందు యాగశాల ప్రారంభించి పూజలు చేశారు. అనంతరం డయాఫ్రమ్‌వాల్‌ను పరిశీలించారు. బావర్‌, ఎల్‌అండ్‌టీ ప్రతినిధులతో మాట్లాడారు. నిర్మాణ పనుల గురించి అడిగి తెలుసుకున్నారు. తర్వాత స్పిల్‌ ఛానల్‌ వద్ద 13 జిల్లాల నుంచి వచ్చిన రైతులతో నిర్వహించిన సమావేశంలో మాట్లాడారు.

11ap-main1b.jpg

‘ప్రపంచంలోని అన్ని భూగర్భ ప్రాజెక్టు పనులను బావర్‌ సంస్థ చేసింది. డయాఫ్రమ్‌వాల్‌ నిర్మాణంలో భాగంగా బెంటోనైట్‌ మిశ్రమంతో కలిపి ప్లాస్టిక్‌ కాంక్రీటు వేశారు.. దీంతో నాణ్యత పదింతలు పెరిగింది. చుక్క నీరు కూడా కిందకు ఇంకదు. ఎల్‌అండ్‌టీ సంస్థతో కలిపి ఈ ప్రతిష్ఠాత్మక పని పూర్తిచేశారు. ఇంజినీర్లు, మంత్రి కలిపి పట్టుదలతో దీన్ని కొలిక్కి తెచ్చారు. అందరినీ మనస్ఫూర్తిగా అభినందిస్తున్నాను. 63సార్లు వర్చువల్‌ తనిఖీలు చేశాను. 25సార్లు ప్రత్యక్షంగా పరిశీలించాను. ఇది అధికారులకు స్ఫూర్తినిచ్చింది. మధ్యలో అనేక ఇబ్బందులు వచ్చాయి. కేంద్రం కూడా అప్పుడప్పుడు సరిగా స్పందించలేదు. ఇవన్నీ తట్టుకుంటూ పనులు వేగంగా జరిగేలా చూశాం. తెలంగాణ నుంచి ఏడు   మండలాలు మనకివ్వకపోతే ప్రమాణ స్వీకారం చేయనని ఆ రోజు చెప్పాను. అవి కలిపాకే పనులు ప్రారంభమయ్యాయి. ఇప్పటికే రూ.14వేల కోట్లు ఖర్చుచేశాం. మొత్తం ప్రాజెక్టుకు రూ.57వేల కోట్లు అవసరం. ఇందులో రూ.5వేల కోట్లు విద్యుత్‌ ప్రాజెక్టుకి అవుతుంది. 52వేల కోట్లలో ఇప్పటికే 14వేల కోట్లు వెచ్చించామంటే.. ఇంకా రూ.38వేలకోట్లు ఖర్చు చేయాల్సి ఉంది. అందులో రూ.27వేల కోట్ల నుంచి 28వేల కోట్ల వరకూ భూసేకరణ, ఆర్‌అండ్‌ఆర్‌ ప్యాకేజీకే అవుతుంది. ఇప్పటివరకు ప్రాజెక్టు పనులు 55.12శాతం అయ్యాయి. ప్రాజెక్టు పూర్తయితే 7.20లక్షల ఎకరాలకు సాగునీరు అందుతుంది. 40లక్షల ఎకరాలకు స్థిరీకరణ వస్తుంది. గోదావరి, కృష్ణా, నాగావళి, వంశధార, పెన్నా నదులు అనుసంధానించనున్నాం. మీ ఆశీస్సులతో శ్రీకాకుళం నుంచి అనంతపురం వరకు నీటిఎద్దడి లేకుండా చేయాలన్నది నా ధ్యేయం.

ప్రాజెక్టులో 55.12 శాతం పనులు పూర్తి
హెడ్‌వర్క్సు పనులు 38.2శాతం, మొత్తం ప్రాజెక్టు పనులు 55.12శాతం  పూర్తయ్యాయి. కుడికాలువ 89.శాతం, ఎడమ ప్రధానకాలువ పనులు 65.01శాతం జరిగాయి. స్పిల్‌వే పనులు వేగం పుంజుకున్నాయి. త్వరలో అన్ని రికార్డులూ అధిగమించబోతున్నాం. కాంక్రీటు పనులకు ట్రాన్సుట్రాయ్‌ పూర్తిగా సహకరిస్తోంది. వారినీ అభినందించాలి. ప్రాజెక్టుకు 1,67,213 ఎకరాలు అవసరం కాగా 1,10,330 ఎకరాలు సేకరించాం. ఇంకా 55,650 ఎకరాలు సేకరించాల్సి ఉంది. దీనికి 6,373కోట్లు అవసరం కాగా 5653కోట్లు ఖర్చు పెట్టాం. రూ.21వేల కోట్లు ఇవ్వాల్సి ఉంది. లక్ష కుటుంబాలకు పునరావాసం కల్పిస్తున్నాం.’

saichinu

Avatar / Picture

Once & Always Tarak
Registered:
Posts: 29,022
Reply with quote  #44 

Polavaram project achieves major milestone, 1400 m long diaphragm wall completed

The multi-purpose Polavaram project dam would be150 feet high and will store 194 TMCs of water. This project will help irrigate over 7.2 lakh acres beside providing drinking water to several cities and towns, and to industries.

[polavaram-project1200]Andhra Pradesh Chief Minister N Chandrababu Naidu today inaugurated the pylon marking the completion of diaphragm wall at the project site in West Godavari district. (Source: Twitter/N Chandrababu Naidu)

The Polavaram Project reached a major milestone on Monday with the completion of the crucial diaphragm wall. The longest and deepest such wall in the country, it forms the foundation for the Earth-cum-Rock-Fill (ECRF) Dam of the Polavaram project across the Godavari river. The diaphragm wall constructed below the ECRF dam prevents the leakage of water across the dam from the bottom of ECRF through sand pores.

It has been constructed in a record time of 14 months at a cost of Rs 423 crores.

The 1400 metres long diaphragm wall is 5 feet thick and is 130 to 307 feet deep at places below the ground. By deploying the latest German technology, the diaphragm wall is constructed using a special clay construction material called ‘bentonite’ to make it absolutely water proof. This can facilitate the hassle-free project construction even during the flood season without any leakages or breaches. About 2500 workers and 500 engineers worked on a mission mode towards completing the diaphragm wall which is a key component in Polavaram project construction.

“The toughest part of the project is done with the completion of the diaphragm wall. Next season we will start work on the earthen dam and the two coffer dams. On Sunday, we poured 11,158 cubic metres of concrete on a single day to finally complete the diaphragm wall. Polavaram project is now 55.12 per cent complete. Construction of the two coffer dams will start in the second week of October after the monsoon and will be completed in six months. The earthen dam will take another year,” VS Ramesh Babu, advisor on Polavaram Project to Government of AP, said on Monday

 
The spillway would be completed by May next year including the erection of sluice gates. The 183 kms long Right Main Canal which joins the Krishna River at Prakasam Barrage at Vijayawada is already complete while the 181 kms long Left Bank Canal that will supply water to Visakhapatnam is under construction.

Officials said that so far Rs 13,755 crores has been spent on the Polavaram Project of which Rs 8,619 crores has been spent after the Centre declared it as a national project from April 2014. “The Centre has so far reimbursed AP Rs 6,800 crores of the Rs 8,619 crores spent since April 2014. The remaining amount is yet to be given,” an official said.

Chief Minister N Chandrababu Naidu today inaugurated the pylon marking the completion of diaphragm wall at the project site in West Godavari district.

The multi-purpose Polavaram project dam would be150 feet high and will store 194 TMCs of water. This project will help irrigate over 7.2 lakh acres beside providing drinking water to several cities and towns, and to industries.

babu_mahesh

Jackie
Registered:
Posts: 6,509
Reply with quote  #45 
diaphragm wall complete chesi nation ki ankitham chesara 😃
Kabali2016

Registered:
Posts: 588
Reply with quote  #46 
Quote:
Originally Posted by Movie_Muchatlu

96-04 lo asalu deeni gurinchi pattinchukune ledu.. YSR brought it back to lime light with all the approvals. (may be his intention is also elections & corruption)

State spending is more to ensure its under their control and get their contractors to get work.. dani kosam malli edo thyagam chesina matalu enduku lendi.. inallu natha nadaka nadichi inka election last 2 years lo pargeduthundi... 

inka next post lo Dholera 3l crores post vastundemo..

antha fraud chese guju tho tie up ayyina CBN ni ela nammali inka.. ? ipudu malli congress antunaru oka 4 yrs ayyaka malli.. gandhi family dochukovtleda antaru...  its a cycle of events.. 

But Polvaram complete cheste benifit ayedhi AP.. so if he can complete.. not harm in bringing him back. kaani prathi phase ki publicity chestunapudu konchem ekuva highlight avuthundi both sides.. 



DPR,Environmental Clearances,land acquisitions were completed and approved during YSR Tenure.?
i have some doubts on this,Twitter lo TDP vallu chepadam enivornmental clearnce and Land acquisition(till 2014 20-30% ayyindhi annru) complete avaledu annaru.
babu_mahesh

Jackie
Registered:
Posts: 6,509
Reply with quote  #47 
Quote:
Originally Posted by Kabali2016


DPR,Environmental Clearances,land acquisitions were completed and approved during YSR Tenure.?
i have some doubts on this,Twitter lo TDP vallu chepadam enivornmental clearnce and Land acquisition(till 2014 20-30% ayyindhi annru) complete avaledu annaru.


In 1980, then Chief Minister of Andhra Pradesh T. Anjaiah laid the foundation stone for the project to fulfill the stipulations of Godavari Water Disputes Tribunal agreement.[21] The project is stalled till YSR Reddy in 2004 the then chief minister of AP took the project to work. YSR got the required permissions for the projects before he died.[22] for polavaram project, Site clearance was obtained from the Centre on 19 September 2005, environmental clearance on 25 October 2005, R & R clearance on 17 April 2007, wildlife sanctuary clearance on 19 Sept 2008, forest clearance on 26 Dec 26 2008 and technical advisory committee clearance on 20 January 2009. 
Movie_Muchatlu

Avatar / Picture

Timepass
Registered:
Posts: 5,477
Reply with quote  #48 
Quote:
Originally Posted by Kabali2016


DPR,Environmental Clearances,land acquisitions were completed and approved during YSR Tenure.?
i have some doubts on this,Twitter lo TDP vallu chepadam enivornmental clearnce and Land acquisition(till 2014 20-30% ayyindhi annru) complete avaledu annaru.
I never supported YSR and even now never plan to vote for YSRCP. But nenu chusina chaala neutral articles and other info prakaram.. its who started it back.. irrigation gurinchi chusina tharuvatha telisindi emanti.. 2004 nunchi it got main priority back for the govt. (albeit with more corruption). 
saichinu

Avatar / Picture

Once & Always Tarak
Registered:
Posts: 29,022
Reply with quote  #49 
saichinu

Avatar / Picture

Once & Always Tarak
Registered:
Posts: 29,022
Reply with quote  #50 
C3LQTjc.jpg
Previous Topic | Next Topic
Print
Reply

Quick Navigation:

Easily create a Forum Website with Website Toolbox.