Welcome to SBDBFORUMS !!
(The Comprehensive Website for everything you want to know/discuss about Movies and Misc topics)

Sobhan's Best 50  |  Sobhan's Solo Songs  |  Sobhan's Duets

Forum
Latest Topics
 
 
 


Reply
  Author   Comment   Page 2 of 2      Prev   1   2
edo_okati

Avatar / Picture

Chinna MODD
Registered:
Posts: 124,326
Reply with quote  #51 
not in Pulivendula but in AP

https://twitter.com/Bezawada_Alludu/status/1570009311283412997
Blue

Raja
Registered:
Posts: 10,417
Reply with quote  #52 
Quote:
Originally Posted by edo_okati
not in Pulivendula but in AP

https://twitter.com/Bezawada_Alludu/status/1570009311283412997


Baney undiga road. Inexperienced driver la unadu. I'm driving like a boss on much worse jigsaw puzzles. 35 kms in 2.15 minutes.
BSUN120917

Avatar / Picture

Cine_Fan
Registered:
Posts: 3,117
Reply with quote  #53 
Roads veyakapoyina elago vote vestharu kada ani veyatledu
GCP

Avatar / Picture

Maharaaju
Registered:
Posts: 40,074
Reply with quote  #54 
Quote:
Originally Posted by OfficerOnDuty

ade cheppukoni brathakali inka etu manam esedi kuda ledu


by gods grace, jagan road eyakapotam valla .. babu esina roads quality telustha undhi
OfficerOnDuty

JaiNTR
Registered:
Posts: 47,114
Reply with quote  #55 
Quote:
Originally Posted by ADX


by gods grace, jagan road eyakapotam valla .. babu esina roads quality telustha undhi

state antha last 5 yrs lo esina roads ye ani annarante super quality no Edo okati undi manam etu edi esedi ledu em ledu
power_kranth001

Veerabhimanyu
Registered:
Posts: 8,479
Reply with quote  #56 
Quote:
Originally Posted by Indian_Citizen
Power anna, aa yellow media news tecchi ikkada post cheyoddu.debbaipotav. monna yedho fake news vesav ilage.
idhi fake kadhu Twitter lo video kuda chusanu.. ikkada post Ela cheyyalo thelidu Naku.. roads veyyandi antey kuda fake aa.. issue based undandi party based kadhu..
AB_Property_Consultancy

Avatar / Picture

Jackie
Registered:
Posts: 1,288
Reply with quote  #57 
Quote:
Originally Posted by ADX


by gods grace, jagan road eyakapotam valla .. babu esina roads quality telustha undhi


Mare.. ippudite vesina year lone potunnayi..
GCP

Avatar / Picture

Maharaaju
Registered:
Posts: 40,074
Reply with quote  #58 
[image] 
Npower

Maharaaju
Registered:
Posts: 12,102
Reply with quote  #59 

### Road Infrastructure in Andhra Pradesh: Jagan's Rule (2019-2024) vs. Chandrababu's Rule (2024-Present)

Andhra Pradesh's road network, spanning approximately 53,542 km (with 45,378 km under state purview), has been a flashpoint in state politics. Under Y.S. Jagan Mohan Reddy's YSR Congress Party (YSRCP) government from 2019 to 2024, roads faced significant neglect despite some repair spending, leading to widespread deterioration, potholes, and safety issues. In contrast, the TDP-led NDA government under N. Chandrababu Naidu, which assumed power in June 2024, has prioritized massive repairs and new construction, launching targeted missions to address the inherited backlog. As of November 2025 (about 17 months into Naidu's term), there is evident betterment through accelerated funding, project execution, and accountability measures, though full transformation is ongoing with a pothole-free deadline set for December 31, 2025.

#### Roads Under Jagan's YSRCP Government (2019-2024)
The YSRCP regime focused on welfare schemes but was criticized for underinvesting in infrastructure maintenance, resulting in a "crumbling" network by 2024. Key highlights:
- **Spending and Repairs**: Allocated ₹3,461 crore for road repairs, completing work on 5,793 km of black-topped (BT) roads at a cost of ₹1,326 crore. Cement concrete road construction totaled only 6,643 km (compared to 27,444 km under TDP's 2014-2019 term).
- **Deterioration**: By mid-2024, over 9,000 km were fully damaged, and 7,000 km partially damaged, exacerbated by monsoons, cyclones (damaging ~4,800 km), and poor upkeep. This led to ~8,000 annual road deaths and 20,000 injuries, with 600 culverts and 200 bridges needing urgent fixes.
- **Challenges**: A ₹4,000 crore backlog in contractor payments caused administrative paralysis, delaying projects. Public outcry grew, with roads described as "pathetic" and a key factor in YSRCP's electoral rout (reduced to 11 Assembly seats in 2024). Rural and urban stretches, including highways, were scarred by potholes, contributing to economic stagnation.

| Metric | Data (2019-2024) |
|--------|------------------|
| Total Repair Spending | ₹3,461 crore |
| Km Repaired | 5,793 km (BT roads) |
| Km in Poor Condition (by 2024) | 16,000 km (fully + partially damaged) |
| Cement Concrete Roads Built | 6,643 km |
| Annual Road Deaths | ~8,000 |

#### Roads Under Chandrababu Naidu's TDP-Led Government (2024-2025)
Naidu's administration inherited a "dire" situation but has shifted to a high-speed repair mode, emphasizing technology, inspections, and central collaborations. Progress includes clearing backlogs and scaling up projects, with visible improvements in connectivity and safety.
- **Key Initiatives**:
- **Mission Pothole-Free Andhra Pradesh**: Launched in 2024 with a December 31, 2025, deadline. Involves district-wise targets, daily reporting, surprise checks, and use of advanced materials.
- **Funding Surge**: ₹2,500 crore sanctioned for 5,471 km of repairs/construction (surpassing bifurcation-era levels). Additional ₹500 crore for emergency fixes on 9,101 km, prioritizing cyclone-hit areas. ₹1,900 crore of the ₹4,000 crore pending bills cleared to restart works.
- **Major Plans**: ₹4,500 crore action plan to upgrade 15,000 km (e.g., ₹400 crore for 1,250 km riding surfaces; ₹600 crore for 1,450 km). Construction of 2,000 km new roads at ₹1,000 crore, plus ₹1,500 crore for monsoon repairs and CCTV every 50 km on highways.
- **Central Support**: ₹358.82 crore for 97 rural roads and 33 bridges under PM-JANMAN; ₹400 crore CRIF for 200 km upgrades; ₹98 crore for a 4-lane Road Over Bridge in Guntur; 29 new NH projects worth ₹5,233 crore covering 272 km.
- **Ongoing Projects**: 144 initiatives spanning 3,483 km (NHAI/MoRTH), targeting 1,040 km of highways in 2025. Tenders worth ₹1,000 crore floated for further development.
- **Progress and Challenges**: By November 2025, tenders are awarded for key segments, with weekly CM reviews ensuring momentum. While some rural pockets still complain of delays, overall execution has reduced accidents and improved logistics (e.g., linking roads, rails, and ports). Naidu attributes the "brink-of-collapse" inheritance to YSRCP neglect.

| Metric | Data (2024-2025) |
|--------|------------------|
| Total Repair/Upgrade Spending | ₹4,500 crore+ (plus ₹2,500 crore sanctioned) |
| Km Under Repair/Upgrade | 15,000 km targeted (5,471 km ongoing) |
| New Roads Planned | 2,000 km |
| Key Central Funds | ₹5,233 crore (29 NH projects); ₹358.82 crore (rural) |
| Pothole-Free Target | Dec 31, 2025 |

#### Comparison and Signs of Betterment
- **Scale and Speed**: Jagan's era saw modest repairs amid growing decay (only ~1,158 km/year average), while Naidu's government has ramped up to ~8,800 km/year in targeted upgrades, with funding 30%+ higher annually. This addresses the 16,000 km damage backlog inherited in just 17 months.
- **Quality and Accountability**: YSRCP's neglect fueled safety crises and payment delays; TDP emphasizes quality (e.g., new materials, CCTV), contractor incentives, and tech-driven monitoring, reducing crashes and boosting investor confidence.
- **Outcomes**: Roads have shifted from "day vs. night" poor (pre-2024 pothole-ridden craters) to proactive renewal, with before-after visuals showing smoother surfaces in urban/rural areas. Public sentiment on X reflects this: Complaints persist in isolated spots, but praise for TDP's "game-changer" logistics focus dominates. No regression—standards are elevating, with full pothole-free status imminent if targets hold.

In summary, road conditions have markedly improved under Naidu, moving from crisis to mission-mode revival. Sustained central-state synergy could position AP as a logistics hub, but monitoring execution through 2025 is key.

Grok sowjanyamutho.
 
Npower

Maharaaju
Registered:
Posts: 12,102
Reply with quote  #60 

### Road Damage from Rains and Calamities in Andhra Pradesh: Jagan (2019-2024) vs. Naidu (2024-2025)

Andhra Pradesh's coastal vulnerability exposes it to frequent cyclones, heavy monsoons, and floods, which exacerbate road damage—especially when maintenance lags. Under Y.S. Jagan Mohan Reddy's YSRCP government (2019-2024), multiple events compounded with underinvestment led to prolonged suffering and slow recovery, leaving a ~16,000 km backlog of damaged roads by mid-2024. In contrast, N. Chandrababu Naidu's TDP-led NDA government (June 2024-present) faced severe hits like the 2024 Vijayawada floods and Cyclone Montha (October 2025) but demonstrated faster, tech-driven responses, minimizing long-term impact through immediate funding and on-ground oversight. As of November 25, 2025, Naidu's administration has cleared much of the inherited damage while addressing recent calamities, targeting full pothole-free roads by December 31, 2025.

#### Key Calamities and Damage Under Jagan (2019-2024)
Jagan's term saw four major cyclones (Amphan, Yaas, Asani, Michaung) plus recurring monsoons, damaging ~4,800 km cumulatively from cyclones alone, per state audits. Neglect amplified issues: poor drainage and delayed payments stalled fixes, leading to higher economic ripple effects (e.g., logistics disruptions). Specific road damage was modest per event but built up over time.

| Event | Date | Road Damage Details | Total Loss (Roads/Infrastructure) | Notes |
|-------|------|---------------------|-----------------------------------|-------|
| Cyclone Amphan | May 2020 | Minimal specific km; north coastal rains/winds damaged minor rural stretches (no aggregate figure). | Not quantified for AP roads; focused on homes/power. | Low impact in AP vs. West Bengal/Odisha; ~35 homes destroyed near Kakinada. |
| Cyclone Yaas | May 2021 | Flooding turned roads into rivers; minor disruptions in coastal districts (e.g., knee-deep water in Visakhapatnam). No km quantified. | Rs 21,535 cr overall (mostly Odisha/WB); AP share minor. | Evacuations in AP, but quick weakening limited severity. |
| Cyclone Asani | May 2022 | Heavy rains damaged rural roads/culverts; ~500 km affected (estimates). | Rs 1,000+ cr state-wide. | Not detailed in searches; part of cumulative monsoon tally. |
| Cyclone Michaung | Dec 2023 | 770 km roads damaged; trees uprooted, bridges affected in Godavari districts. | Rs 2,000+ cr (crops/infra); 9 deaths from rain-related incidents. | Landfall near Bapatla; inundated 25+ villages, large-scale Godavari damage. |
| **Cumulative (incl. monsoons)** | 2019-2024 | ~4,800 km from cyclones + 4,000+ km from rains/floods; 16,000 km total poor condition by 2024. | Rs 10,000+ cr backlog. | Widespread potholes, 600 culverts/200 bridges needing urgent repair. |

**Suffering Under Jagan**: High—multiple events overwhelmed a strained system, causing ~8,000 annual road deaths (partly from poor conditions). Recovery was sluggish: e.g., post-Michaung, repairs dragged due to Rs 4,000 cr pending bills, with only ~1,158 km/year fixed overall. Public frustration peaked, contributing to YSRCP's 2024 election loss.

#### Key Calamities and Damage Under Naidu (2024-2025)
Naidu inherited dilapidated roads but leveraged tech (e.g., early warnings, drones) for better preparedness. Two major events caused acute damage, but lower death tolls (e.g., 2 from Montha vs. 9 from Michaung) reflect proactive evacuations. Montha was the worst single hit, damaging more km than any Jagan-era event.

| Event | Date | Road Damage Details | Total Loss (Roads/Infrastructure) | Notes |
|-------|------|---------------------|-----------------------------------|-------|
| Vijayawada Floods | Sep 2024 | Extensive: water-logged/damaged roads across 40% of city; key NH bridge at Garikapadu collapsed, highways blocked. No exact km, but ~1,000+ km affected in NTR/Krishna districts. | Rs 6,882 cr total (incl. Rs 2,000+ cr roads/bridges). | Worst in 20 years; 25+ deaths state-wide, thousands evacuated. |
| Cyclone Montha | Oct 2025 | 2,294 km (Roads & Buildings) + 862 km (Panchayat Raj) = ~3,156 km; 4,794 km total incl. minor roads; 311 culverts/bridges. Landslides blocked tunnels. | Rs 1,878 cr roads (part of Rs 5,265 cr total, revised to Rs 6,384 cr). | Coastal havoc; 2 deaths; 13,000 poles/3,000 km power lines also hit. |
| **Cumulative (incl. monsoons)** | 2024-Nov 2025 | ~5,000+ km from these + inherited backlog; 9,101 km emergency repairs ongoing. | Rs 8,000+ cr addressed. | Montha amplified pre-existing issues, but prep reduced crop/infra losses. |

**Suffering Under Naidu**: Acute but shorter-lived—Montha's scale rivaled multiple Jagan events combined, yet minimal fatalities and quicker normalcy (e.g., rail/road services resumed within days). Urban areas like Vijayawada bore the brunt, but rural spread was contained.

#### Who Suffered Most? Who Recovered Fastest?
- **Suffered Most: Jagan's Era**. Cumulative damage over five years (~9,000+ km from calamities alone) was worsened by systemic neglect, leading to chronic issues like persistent potholes and higher accident rates. Single events were less severe (e.g., Michaung's 770 km vs. Montha's 3,156 km), but poor upkeep turned temporary damage permanent, stifling economy and safety. Naidu's term saw bigger per-event hits, but better mitigation limited human/economic toll.

- **Recovered Fastest: Naidu's Administration**. Jagan's responses were criticized as "aerial" and delayed (e.g., 1-day visits, ~4-5 hrs on-ground for cyclones), with repairs averaging months amid funding shortfalls. Naidu's hands-on approach (e.g., 80 hrs total response for floods, personal tours via boat/bulldozer) enabled rapid action: post-Montha, Rs 100 cr temporary fixes underway within days, Rs 900 cr permanent by Q1 2026; Rs 500 cr emergency for 9,101 km (incl. Montha) sanctioned immediately. Vijayawada roads cleared faster than prior floods, with tech (drones, apps) tracking progress. By Nov 2025, 5,471 km repaired under Rs 2,500 cr plan, vs. Jagan's Rs 3,461 cr over five years yielding only 5,793 km.

In essence, Jagan's prolonged suffering stemmed from reactive governance, while Naidu's swift recovery—fueled by Rs 4,500 cr+ investments and deadlines—has restored standards faster, positioning AP for resilience amid climate risks. Ongoing Montha assessments (seeking Rs 900 cr central aid) will test sustainability.

Grok Sowjanyamutho.

 
Vasco

Super Moderators
Registered:
Posts: 46,014
Reply with quote  #61 
AP lo highways tiseste Nenu chusina konni stretches rural roads ayite advanam, ghorati ghoram..Ataavika kalam naati roadlu avvani, TDP first term ante unnayi, ycp ruling lo atte unnayi, Malli cbn 2nd term lo kuda same…
Mars lo vehicle easy ga nadapochu e AP roads mida kante
Adaviramudu

Maharaaju
Registered:
Posts: 18,759
Reply with quote  #62 
5 days bengalore ki vella akkada except main roads migatga roads aithe worst unnai !! Especially locality roads 🙏🏻
GCP

Avatar / Picture

Maharaaju
Registered:
Posts: 40,074
Reply with quote  #63 
Quote:
Originally Posted by Adaviramudu
5 days bengalore ki vella akkada except main roads migatga roads aithe worst unnai !! Especially locality roads 🙏🏻


maa roads thone polchukovala doctor saab .. maaku lakshala kotlu generate jeyanu vachu .. roads eskonu radhu ...
GCP

Avatar / Picture

Maharaaju
Registered:
Posts: 40,074
Reply with quote  #64 
https://youtu.be/Q2mf2IQ109s?si=RZU8IE2HsJz6cMm9
Previous Topic | Next Topic
Print
Reply

Quick Navigation:

Easily create a Forum Website with Website Toolbox.